Cherry Glen Culvert Replacement Project

Replace two existing concrete culverts with two sub-elevated pre-cast concrete culverts including headwalls, guardrailing and bio-engineered fill in the channels. Widen approximately 0.17 mi of roadway between culverts including approaches, and overlay with HMA on Cherry Glenn Road between Rivera Road and I-80 west of Vacaville.
  Plans (click to expand/collapse)