Stevenson Bridge Road Bridge Rehabilitation Project BRLS 5923 (059)

General Work Description: The Stevenson Bridge Road Bridge Rehabilitation Project is located approximately 8 miles north of Dixon, California. The project involves retrofitting the existing bridge, performing foundation upgrades, and improving the roadway approaches. The retrofit work includes carbon fiber wrapping of the arch, portal, vertical, and pier members; installation of reinforced concrete girders and abutment bolsters; replacement of tie girder prestressing tendons; removal and patching of unsound concrete; epoxy injection of larger cracks; and removal of the existing concrete deck surface followed by placement of a polyester concrete overlay. Foundation work consists of installing new 2.2-meter cast-in-drilled-hole (CIDH) piles at each support, concrete footing encasement, and construction of a permanent access road from the top of the north east bank to the bottom of the channel. Roadway approach work includes tree removal, grinding and removal of the existing asphalt concrete surface, grading, and construction of approximately 800 linear feet of new roadway.

Status

Accepting Bids

Prebid Date 11/6/25 10:00am
Bid Date 11/21/25 2:00pm

Company & Contacts

Solano County Public Works Engineering
Matt Tuggle  

Location

Solano County, CA

The estimated cost of the project is $ 10,200,000

The County will perform a mandatory pre-bid walkthrough for contractors on November 6th, 2025, beginning at 10:00 a.m. (local time) on the north end of the project. Solano County will identify areas of interest and important aspects of the project. Attendance will be taken. All prime contractors that will submit a bid must be captured on the attendance sign-in sheet.